call us 1.800.743.0603 FacebookLinkedIn

Educational Previous

Jamrich Hall Steel Erection | Marquette, Michigan

This project consisted of supplying and erecting the structural and miscellaneous steel for this 133,000 sq. ft., three story, 30 million dollar classroom facility at Northern Michigan University. Our work scope of work consisted of erecting structural steel, miscellaneous and access steel, bar joists, metal decking, and decorative tube truss canopies. The main portion of steel erection (Phase I) was performed in the summer of 2013 and Phase II (an interconnection) was completed in July 2014.

See Project Sheet

Owner: Northern Michigan University
Construction Manager: Miron Construction Co, Inc.
Architect/Engineer: Neumann Smith Architecture
Project Cost: $2.75 million
Project Delivery: Trade Package
Project Duration: 4 months
Completed: July 2014