call us 1.800.743.0603 FacebookLinkedIn

Industrial Previous

Humboldt Mill MEP Buildout | Champion, Michigan

Gundlach Champion entered into the single largest contract at the Eagle Nickel & Copper Mine processing plant with Lundin Mining for the Major Build Out package. This site is located 30 miles west of Marquette, Michigan. Gundlach Champion’s self-performed work scope included installation of concrete, masonry, structural and miscellaneous steel, pre-engineered metal buildings, conveyors, and major equipment. Gundlach Champion subcontracted out the civil site work, specialized architectural trades, HVAC/plumbing, process piping, tank installation, electrical, and instrumentation. This 8-month, fast-tracked project required overtime, 2nd shift and Sunday work to meet the owner’s desired completion date. The site workforce peaked at approximately 400 trades persons. The project was completed in the fall of 2014.

See Project Sheet

Owner: Lundin Mining
Construction Manager: Fluor Enterprises, Inc.
Project Delivery: General Construction
Project Duration: 8 months
Completed: December 2014