Shredder Line Installation | Kingsford, Michigan

Gundlach Champion entered into a Design-Build Contract with Schneider Iron and Metal to design and construct a support building and foundations to house their Metso 80/104, 60 tons per hour, New Generation Heavy Service Damp Shredding Plant, as well as perform the installation of the new equipment. The facility also consists of six material handling conveyors to separate non-ferrous material, aluminum, and stainless steel. This state-of-the- art shredder facility is located in Kingsford, Michigan and is powered by a 2,500 HP electric motor. Gundlach Champion self-performed existing equipment demolition, concrete, precast erection and equipment setting. The project took five months to complete and was turned over to the owner in the fall of 2013.

See Project Sheet

Owner: Schneider Iron & Metal
Project Delivery: Design Build
Project Duration: 6 months
Completed: November 2013