CoVantage Credit Union New Branch | Rib Mountain, Wisconsin

Screen Shot 2019-09-04 at 1.23.46 PM
Screen Shot 2019-09-04 at 1.23.55 PM
Screen Shot 2019-09-04 at 1.24.03 PM
Screen Shot 2019-09-04 at 1.24.14 PM
previous arrow
next arrow

  • Owner: CoVantage Credit Union
  • Architect/Engineer: Mudrovich Architects
  • Project Cost: $1.6 million
  • Completed: June 2008

The project consists of a 7000 sf, slab on grade, wood frame / brick veneer structure. The roof is wood truss with asphalt shingles and skylight. Interior is metal studs and drywall with carpet / ceramic tile flooring, acoustical ceilings, paint & vinyl wall covering, plastic laminate casework and standard plumbing , HVAC and electrical packages. Exterior concrete curbs & walks, landscaping and asphalt paving are also included.